Warning: Cannot modify header information - headers already sent by (output started at /home/content/k/e/n/kenji4web/html/wp-content/themes/moonlight/header.php:2) in /home/content/k/e/n/kenji4web/html/wp-content/themes/moonlight/header.php on line 5

Warning: Cannot modify header information - headers already sent by (output started at /home/content/k/e/n/kenji4web/html/wp-content/themes/moonlight/header.php:2) in /home/content/k/e/n/kenji4web/html/wp-content/themes/moonlight/header.php on line 6

Warning: Cannot modify header information - headers already sent by (output started at /home/content/k/e/n/kenji4web/html/wp-content/themes/moonlight/header.php:2) in /home/content/k/e/n/kenji4web/html/wp-content/themes/moonlight/header.php on line 7
Playa Hermosa – The Different Path

Posts tagged with: Playa Hermosa

Shipwreck Update – 2nd Attempt Required

November 30, 2010 – 4:39 am

After numerous man hours of underwater work this weekend the rear and heaviest section of the wreck floated 1-2 meters off the ground.  The front and lighter portion was still lodged in the sand.  We did move the wreck 5 meter to the west.  We are confident that on the 2nd attempt this week with [...]

By condofish | Posted in Uncategorized | Also tagged , , , , , , | Comments Off

Shipwreck Recovery Work Schedule and Sunday’s Party!

November 26, 2010 – 5:12 am

Friday afternoon at 2pm (Today), the CondoFish team will begin attaching the hard-wear and ropes to the wreck so that the 20-30 55 gallon drums can be attached.  If all goes according to plan, all of the barrels should be attached and resting underwater by the end of Saturday. Shipwreck Party Sunday afternoon we should have the [...]

By condofish | Posted in Uncategorized | Also tagged , , , , , , | Comments Off

Phase 1 Shipwreck Recovery – Success

November 21, 2010 – 11:12 am

This Saturday, November 20th, the first phase of the 70 foot shipwreck recovery in Playa Hermosa was completed.  After 3 hours of difficult underwater work, in low visibility and turbulent conditions, the wreck piece surfaced.  This first part of the boat wreck needed nine air filled 55 gallons barrels to float.  The CondoFish team used 14 air [...]

By condofish | Posted in Uncategorized | Also tagged , , , , , , , , | Comments Off